WATER WORKS – overcoming challenges to achieving good water status in urban areas
Hosted by The Environment Agency at The Museum of Science and Industry, Manchester, – 24th May 2016
"Eco-management and competitiveness in agribusiness. The wine sector: a practical experience of carbon sequestration"
ACI ́s European Algae Biomass (22-23 April 2015) Amsterdam, The Netherlands
European Sustainable Phosphorus Conference 2015
(5 & 6 of March, 2015)
LIFE + 2013 Environment Policy and Governance approved projects from Spain. (1-5-2014)
Andalussía drives 4 of the 68 EU LIFE projects approved to Spain.
(7-5-2014)
LIFE+ TL-BIOFER Kick-off meeting was celebrated at Cordova on July the 14th, 2014
Last update: 04-Nov-2016
Action B3.- Construction and on-site installation of TWIN LAYER prototype at the WWTP has been finished by Bio-Logicals
TL-Module step by step
Action B3.-Construction and on-site installation of TWIN-LAYER prototype at the WWTP
Extracted from Deliverable "D-B2.- DVD with 3D modeling of the prototype and operating animation" elaborado por Bio-Logicals.
Extracted from Deliverable "D-B2.- DVD with 3D modeling of the prototype and operating animation" elaborado por Bio-Logicals.
Extracted from Deliverable "D-B2.- DVD with 3D modeling of the prototype and operating animation" elaborado por Bio-Logicals.
Daniel Carrera (Bio-Logicals) "networks" at LIFE+ INTEGRAL CARBON
FIRST tl-prototype DRAWINGS
Action B1.- "Strain Selection based on their growth rates and nutrient uptake capacities in TL using original wastewater" has succesfully finished. (6/2015), developed by University of Cologne.
7 samples from El Viso-Villaralto WWTP
33 isolates from WWTP, 1 from CCAC tested.
5 selected growthrates determination
1 nutrient uptake strain "winner":
Manuel Dios (EMPROACSA) presenting TL-BIOFER
Action "D2.- Project logo design and slogan", developed by Bio-Logicals, has finished as the logo and slogan for TL-BIOFER are alredy available. (7/2014).
Last 30th of June, 2014 all the LIFE+ TL-BIOFER participants meet at EMPROACSA Headquarters at Cordova (Spain). We treated the main topics of the projects, including the tasks to be done the from the begining of the Project to the end of 2014.
TL-BIOFER management team.
TL-BIOFER participants visited EMPROACSA WWTP at El Viso-Villaralto (Cordova), where the TWIN-LAYER system is going to be installed.
WWTP at El Viso-Villaralto (EMPROACSA)